Kōkiri Centre Greywater System presented at WaterNZ Conference
At the WaterNZ Conference in Hamilton on 16 October 2013, James Sukias (NIWA) presented a paper on the greywater wetland installed at the Kōkiri Centre at Whāingaroa (Raglan).
The greywater treatment system was designed and installed as a demonstration site and provides a real-world example of potential improvements to be made to marae wastewater systems through greywater diversion from existing wastewater infrastructure, and dedicated construction of greywater treatment systems.
The next issue of this newsletter will feature a full article on the work completed at the Kōkiri Centre. For more information on WaterNZ visit:
The NIWA project team presented a poster paper to the NZ Land Treatment Collective conference in March, 2014. The poster summarised the results of the questionnaire reported on in this newsletter.
The paper also presented some general design criteria that may apply to marae wastewater treatment system design. For more information on the NZ Land Treatment Collective see:
*These photographs and images have been taken and collated in partnership between NIWA and participating marae for the purpose of the project. Permission to re-use these photographs and images for any purpose must be sought and obtained from NIWA and the partnering marae.